It is the first question almost every customer asks, and rightly so. The honest answer is that there is no single per-part price that applies to everyone: two components of similar size can cost very different amounts depending on their shape, the quantities and what the coating has to do.
What we can do is explain what the price depends on, so you know what can be adjusted and what information to prepare to receive an accurate, fast quote.
What drives plastic coating cost
| Factor | Why it matters | What you can do about it |
|---|---|---|
| Shape and size of the part | They determine how many parts fit into an oven cycle and how complex the holding fixture is | Radius the edges, provide hanging points |
| Quantity and continuity of orders | Setup, and any dedicated fixtures, are spread over the batch: more parts, lower unit cost | Scheduled orders, combined batches |
| Coating thickness and material | More thickness means more material and longer cycles | Define thickness by function, rather than “just to be safe” |
| Areas to leave uncoated | Masking requires manual work or dedicated fixtures. Partial dipping, on the other hand, is a process we specialize in | Work out the best solution with our technical department |
| Surface preparation | Sandblasting, tumbling or electroplating add steps | Decide together which ones are really necessary |
| Color and customization | Custom-matched colors and pad printing add setups | Use standard colors where appearance is not critical |
| Additional processes | Cutting, bending, assembly, special packaging | Have the same supplier handle them to avoid extra shipping and coordination |
The role of fixtures
In dip coating, every part has to be held during preheating, dipping and curing. In most cases we are able to adapt existing fixtures. Dedicated fixtures are needed only for very complex parts or for large batches: in the latter case they are an investment that optimizes the process and lowers production costs. When they are needed, fixtures are charged to the customer.
Prototypes and small batches
Coating just a few parts is possible and often more cost-effective than with other technologies, because dipping does not require equipment dedicated to a single color or part number. The unit cost will be higher than for a series, but it lets you test the product before investing. For a few low-cost parts, say around ten, we usually apply a flat fee, as for a sampling run.
The hidden cost: coordinating multiple suppliers
The price of the plastic coating alone is often only part of the real cost. If the part is cut by one supplier, sandblasted by a second, coated by a third and customized by a fourth, you have to add transport, waiting times, rejects between one step and the next, and the purchasing department’s time spent coordinating everything.
There is also a risk that weighs even more. If upstream processes are not carried out correctly, they generate rejects and can make plastic coating impossible: parts often have to be sent back, the faulty work redone, and only then can they be coated. In these cases costs can more than double.
AGB manages the entire supply chain, from sheet metal to plastic coating, pad printing and assembly. When you entrust us with the finished product, we are responsible for the whole process through to delivery. On many projects, this is where the biggest savings come from, more than from the price of any single process.
How to get a faster (and lower) quote
Here is what we need to give you an accurate quote the first time:
- Technical drawing (PDF and, if available, a 3D file) or a sample or photos with dimensions.
- Part material and any existing treatments (galvanizing, painting).
- Quantity: per batch and per year, if the order repeats.
- Function of the coating: grip, protection, insulation, appearance. This helps us propose the right thickness without over-specifying.
- Areas to leave uncoated and critical dimensions.
- Color and any logo customization.
- Requested delivery dates.
With this information we reply within 48 hours. If anything is missing, we work it out together in a short call.
Five ways to reduce cost without reducing quality
- Involve the supplier at the design stage: small changes to the drawing (a radius, a hanging hole) can greatly simplify the process.
- Define thickness by function, not out of excess caution.
- Group similar part numbers to share fixtures and cycles.
- Schedule orders instead of working through constant rush jobs.
- Have one supplier handle several steps to eliminate transport and intermediate stages.
Frequently asked questions
Can you give me an indicative price per part?
Without a drawing or sample we would risk giving a wrong figure, too high or too low. With the information listed above, the quote arrives within 48 hours and is free of charge.
Does the quote include fixtures?
Fixtures are charged separately, and only when they are needed: in most cases we adapt the ones we already have.
How do you keep delivery times under control?
At AGB, production is monitored by an ERP system and by planning and scheduling software that track machine use, and we work with trusted, selected suppliers: that is how we ensure reliable delivery dates.
Request your quote
Tell us about the part and how it will be used: we will get back to you within 48 hours with a free quote and, if needed, work with you to optimize your product.
→ Request a quote for plastic coating
Read more: guide to metal plastic coating · plastisol dip coating, fluidized bed or powder coating · rubber coating for metal